January 1, 2006 -- Gloves
January 2, 2006 -- Minimizing trapped air bubbles, part two
January 3, 2006 -- Mold Mix 6, part two
January 4, 2006 -- Preventing uneven bowl slumping, part three
January 5, 2006 -- Tempered (toughened) glass
January 6, 2006 -- Kiln-drying plaster/silica molds
January 7, 2006 -- Bisque ware slumping molds
January 8, 2006 -- Bisque ware slumping molds, part two
January 9, 2006 -- Mixing dry enamels
January 10, 2006 -- Mixing dry enamels, part two
January 11, 2006 -- Tack fusing stringers
January 12, 2006 -- Drilling holes in glass using a stained glass grinder
January 13, 2006 -- Glass saws, part three
January 14, 2006 -- Removing labels from bottles, part two
January 15, 2006 -- Repairing ceramic molds
January 17, 2006 -- Sorting glass frit
January 18, 2006 -- Sorting glass frit, part two
January 19, 2006 -- Preventing chipping when using a tile saw
January 20, 2006 -- Tack fusing stringers, part two
January 21, 2006 -- Removing kiln wash from the kiln shelf, part two
January 22, 2006 -- Transferring designs to fiber paper
January 23, 2006 -- Preventing uneven bowl slumping, part four
January 24, 2006 -- Mold Mix 6, part three
January 25, 2006 -- Cutting a circle with a tile saw
January 26, 2006 -- Gold pens for fusing
January 27, 2006 -- Mica Firing Temperatures
January 28, 2006 -- Firing rocks in the kiln
January 30, 2006 -- Preventing chipping when using a tile saw, part two
January 31, 2006 -- Slumping tack fused glass stringers
February 1, 2006 -- Fiber paper as an inclusion
February 2, 2006 -- Firing rocks in the kiln, part two
February 3, 2006 -- Preventing uneven bowl slumping, part five
February 24, 2006 -- Making slumping
molds from clay
February 25, 2006 -- The lost wax casting
process
February 26, 2006 -- Tile saws
February 27, 2006 -- Fire polishing
February 28, 2006 -- Fused pattern bars,
part three
March 1, 2006 -- Fused pattern bars, part
four
March 2, 2006 -- Kiln shelves for large
kilns
March 3, 2006 -- Simultaneous tack fuse
and drop ring
March 4, 2006 -- Simultaneous tack fuse
and drop ring, part two
March 5, 2006 -- Fused bracelet making,
part three
March 6, 2006 -- Removing adhesive
residue
March 7, 2006 -- Making slump molds from
clay, part two
March 8, 2006 -- Firing liquid gold
March 9, 2006 -- Firing liquid gold, part
two
March 10, 2006 -- Safety glasses
March 11, 2006 -- Safety glasses, part
two
March 13, 2006 -- Inexpensive tile saws
March 14, 2006 -- Keeping copper
inclusions bright
March 15, 2006 -- Removing adhesive
residue, part two
March 16, 2006 -- 110-J fiber paper
March 17, 2006 -- Achieving a matte
finish
March 19, 2006 -- Making a drop ring mold
March 20, 2006 -- Making a drop ring mold,
part two
March 21, 2006 -- Inexpensive tile saws,
part two
March 22, 2006 -- Achieving a matte
finish, part two
March 24, 2006 -- Leaf inclusions
March 25, 2006 -- Leaf inclusions, part
two
March 26, 2006 -- Making a drop ring
mold, part three
March 28, 2006 -- Removing wax from a
mold
March 29, 2006 -- Shining the underside
of a piece
March 30, 2006 -- Electroforming, part
two
March 31, 2006 -- Diamond hand pads
April 2, 2006 -- Making slump molds from
clay, part three
April 3, 2006 -- Slumping textured glass
April 4, 2006 -- Drilling holes in glass
with a drill press
April 5, 2006 -- Using the mouth atomizer
April 6, 2006 -- Using the mouth
atomizer, part two
April 7, 2006 -- The flat lap
April 8, 2006 -- The flat lap, part two
April 9, 2006 -- Shining the underside of
a piece, part two
April 10, 2006 -- Kiln shelves for large
kilns, part two
April 11, 2006 -- Diamond hand pads, part
two
April 12, 2006 -- Diamond hand pads, part three
April 13, 2006 -- Battuto
April 17, 2006 -- Preventing dichroic
glass from chipping
April 18, 2006 -- Flux
April 19, 2006 -- Drilling holes in glass
with a drill press, part two
April 20, 2006 -- Using the mouth
atomizer, part three
April 22, 2006 -- Pregnancy and fusing
April 23, 2006 -- Causes of
devitrification
April 24, 2006 -- The cracked kiln shelf
April 25, 2006 -- Using fiber paper to
make a pocket vase
April 26, 2006 -- Quartz inversion
April 27, 2006 -- Museum Gel
April 28, 2006 -- Etching dichroic glass
to prevent chipping
April 30, 2006 -- Causes of devitrification,
part two
May 1, 2006 -- The cracked kiln shelf,
part two
May 2, 2006 -- Drilling holes in glass
with a drill press, part three
May 3, 2006 -- Drilling holes in glass
with a drill press, part four
May 4, 2006 -- Drilling holes in glass
with a drill press, part five
May 8, 2006 -- Sea shell inclusions
May 9, 2006 -- Firing multiple shelves at
once
May 11, 2006 -- Firing schedule for a
pocket vase
May 13, 2006 -- Causes of devitrification,
part three
May 15, 2006 -- Firing multiple shelves
at once, part two
May 16, 2006 -- Treatment for sore hands
May 17, 2006 -- Finishing with
wet/dry sandpaper
May 18, 2006 -- Renewing diamond
pads
May 19, 2006 -- Treatment for sore hands,
part two
May 22, 2006 -- Radial arm drill press
May 23, 2006 -- Fusing with cuttlefish
May 24, 2006 -- Grog
May 25, 2006 -- Treatment for sore hands,
part three
May 30, 2006 -- Layering powder and frit
May 31, 2006 -- Dealing with trapped air
bubbles
June 1, 2006 -- Zinc (galvanized steel)
June 2, 2006 -- Dissolving silicone
adhesive
June 5, 2006 -- Determining the amount of
glass needed, part three
June 6, 2006 -- Dealing with trapped air
bubbles, part two
June 7, 2006 -- Oops!
June 8, 2006 -- Haike brush hairs
June 9, 2006 -- Bare spots in slumping
molds
June 14, 2006 -- Dealing with trapped air
bubbles, part three
June 15, 2006 -- Leaf inclusions, part
three
June 16, 2006 -- Cutting large sheets of
glass
June 20, 2006 -- Preventing dry and
cracked hands
June 21, 2006 -- Steaming wax from molds
June 22, 2006 -- Steaming wax from molds,
part two
June 27, 2006 -- Rigidizing fiber kilns
June 28, 2006 -- Cutting glass mirrors
June 30, 2006 -- Attaching feet to
slumped bowls
July 3, 2006 -- Attaching feet to slumped
bowls, part two
July 6, 2006 -- Testing an overglaze for
lead content
July 10, 2006 -- Hydrocal
July 11, 2006 -- Temperature and rate conversion
July 12, 2006 -- Falling kiln brick
particles
July 13, 2006 -- Falling kiln brick
particles, part two
July 14, 2006 -- Safely using cold
working equipment
July 19, 2006 -- Propane gas powered
glass kilns
July 25, 2006 -- Aluminum as an inclusion
July 26, 2006 -- Aluminum as an
inclusion, part two
July 27, 2006 -- Aluminum as an
inclusion, part three
August 1, 2006 -- Reactive glass colors
August 2, 2006 -- Reactive glass colors,
part two
August 7, 2006 -- Falling kiln brick
particles, part three
August 9, 2006 -- Fusing straight lines
August 14, 2006 -- Falling kin brick
particles, part four
August 16, 2006 -- Falling kiln brick particles, part five
August 29, 2006 -- Pulley system for
heavy kiln lids
August 30, 2006 -- Pulley system for
heavy kiln lids, part two
August 31, 2006 -- Pulley system for
heavy kiln lids, part three
Most recent
September 1, 2006 -- Pulley system for
heavy kiln lids, part four
September 2, 2006 -- Pulley system for
heavy kiln lids, part five
September 6, 2006 -- Fiber rope